The old paint shop of the bulk materials technology specialist was no longer state of the art. A new plant was to be built. The requirements: It should be able to offer flexibility and operate energy-efficiently. The new large-capacity paint booth with two zones and nergy-efficient air management can be monitored by an energy-saving circuit.
Read the full article in MO 7-8-2022 or online here!



